- Additional Information
- Downloads
Experience year-round comfort with our premium 3-4 season sleeping bag, perfect for the Australian outdoors. With temperatures between -5 and 20 degrees, it ensures a cozy night's sleep from spring through to winter. Measuring a generous 213cm x 75cm, it offers plenty of room for adults to stretch out. The durable 190T polyester shell and soft-touch lining provide the perfect balance of warmth and breathability. Filled with 500gsm hollow fibre filling and lined with soft polyester pongee fabric, the sleeping bag is soft, lightweight and water-resistant. For added comfort, the two-way zipper at the bottom allows for easy foot ventilation, while the adjustable drawstring hood keeps you snug on chilly nights. Lightweight and highly portable, it packs down effortlessly into its compact carry bag—ideal for hiking and road trips. Planning a family adventure? We also stock the matching kids' version in our store so the whole family can stay cozy together! Durable, practical, and family-ready, it's the ultimate companion for your next camping getaway.
Features
500g/m² hollow fibre filling
Soft polyester pongee lining
Suitable for -5 degrees to 20 degrees
Lightweight
Water-resistant
Colourful design
Adjustable tightening strap
Secure closure velcro
Double opening zippers
Comes with a carry bag
Specifications:
Color: Pink
Material: 190T polyester ripstop
Filling: 500gsm hollow fibre
Lining: 190T polyester pongee
Temperature range: -5 degrees to -20 degrees
Comfort rating: 10 degrees
External dimensions: 213m (L) x75cm (W)
Packed dimensions: 27m (D) x45cm (H)
Weight: 2kg
Package Content
Single Sleeping Bag x 1
Carry bag x 1
This product comes with 1 year warranty
Shipments to the specific postcode-suburb combinations below are excluded. If you wish to proceed with orders to these zones with additional shipping costs, please reach out to us for assistance.
View Complete List of Undeliverable Postcode Suburb Combinations
| Postcode | Suburb / Location |
|---|---|
| 0803 | WAGAIT BEACH |
| 0811 | CASUARINA |
| 0813 | KARAMA |
| 0814 | NIGHTCLIFF |
| 0821 | WINNELLIE |
| 0822 | ACACIA HILLS, ANGURUGU, ANINDILYAKWA, ANNIE RIVER, BATHURST ISLAND, BEES CREEK, BELYUEN, BLACK JUNGLE, BLACKMORE, BURRUNDIE, BYNOE, BYNOE HARBOUR, CAMP CREEK, CHANNEL ISLAND, CHARLES DARWIN, CHARLOTTE, CLARAVALE, COBOURG, COLLETT CREEK, COOMALIE CREEK, COX PENINSULA, DALY, DALY RIVER, DARWIN RIVER DAM, DELISSAVILLE, DOUGLAS-DALY, EAST ARM, EAST ARNHEM, ELRUNDIE, EVA VALLEY, FINNISS VALLEY, FLEMING, FLY CREEK, FREDS PASS, GALIWINKU, GLYDE POINT, GOULBURN ISLAND, GUNBALANYA, GUNN POINT, HAYES CREEK, HIDDEN VALLEY, HOTHAM, HUGHES, KAKADU, KOOLPINYAH, LAKE BENNETT, LAMBELLS LAGOON, LITCHFIELD PARK, LIVINGSTONE, LLOYD CREEK, MANDORAH, MANINGRIDA, MAPURU, MARANUNGA, MARGARET RIVER, MARRAKAI, MCMINNS LAGOON, MELVILLE ISLAND, MICKETT CREEK, MIDDLE POINT, MILIKAPITI, MILINGIMBI, MILYAKBURRA, MINJILANG, MOUNT BUNDEY, MURRUMUJUK, NAUIYU, NEMARLUK, NGANMARRIYANGA, NUMBULWAR, NUMBURINDI, OENPELLI, PEPPIMENARTI, PIRLANGIMPI, POINT STEPHENS, POINT STUART, PULARUMPI, RAKULA, RAMINGINING, ROBIN FALLS, RUM JUNGLE, SANDPALMS ROADHOUSE, SOUTHPORT, STAPLETON, THAMARRURR, TIPPERARY, TIVENDALE, TIWI ISLANDS, TORTILLA FLATS, TUMBLING WATERS, UMBAKUMBA, VERNON ISLANDS, WADEYE, WAGAIT BEACH, WAK WAK, WARRUWI, WEDDELL, WEST ARNHEM, WICKHAM, WINNELLIE, WISHART, WOOLANING, WURRUMIYANGA |
| 0830 | PALMERSTON CITY |
| 0837 | NOONAMAH |
| 0838 | BERRY SPRINGS |
| 0839 | COOLALINGA |
| 0840 | DUNDEE BEACH, DUNDEE DOWNS, DUNDEE FOREST |
| 0845 | BATCHELOR |
| 0847 | PINE CREEK |
| 0850 | COSSACK |
| 0851 | KATHERINE |
| 0852 | ARNOLD, BAINES, BARUNGA, BESWICK, BESWICK CREEK, BINJARI, BIRDUM, BRADSHAW, BUCHANAN, BULMAN WEEMOL, CRESWELL, DAGURAGU, DALY WATERS, DELAMERE, EDITH, ELSEY, FLORINA, FLYING FOX, GREGORY, GULUNG MARDRULK, GURINDJI, HELEN SPRINGS STATION, JILKMINGGAN, KALKARINDJI, KATHERINE, LAJAMANU, LARRIMAH, LIMMEN, MANBULLOO, MARANBOY, MATARANKA, MCARTHUR, MINIYERI, MINIYERI INTERNAL, NGUKURR, NITMILUK, PELLEW ISLANDS, PIGEON HOLE, ROBINSON RIVER, STURT PLATEAU, TANAMI EAST, TIMBER CREEK, TOP SPRINGS, URALLA, VENN, VICTORIA RIVER, VICTORIA RIVER DOWNS, WARUMUNGU, WAVE HILL, WILTON, YARRALIN |
| 0853 | TINDAL |
| 0854 | BORROLOOLA |
| 0860 | TENNANT CREEK |
| 0861 | TENNANT CREEK |
| 0862 | CALVERT, ELLIOTT, NEWCASTLE WATERS, NICHOLSON, PAMAYU, RENNER SPRINGS, TABLELANDS, TENNANT CREEK, WARREGO |
| 0871 | ALICE SPRINGS |
| 0872 | ALI CURUNG, ALICE SPRINGS, ANMATJERE, ENGAWALA, HAASTS BLUFF, HERMANNSBURG, MIMILI, SANDOVER, SANTA TERESA, TI TREE, YULARA |
| 0873 | AMOONGUNA, ARUMBERA, CONNELLAN, HEAVITREE GAP CPA, ILPARPA, ROSS |
| 0880 | GAPUWIYAK, GUNYANGARA, NHULUNBUY, YIRRKALA |
| 0881 | NHULUNBUY |
| 0885 | ALYANGULA |
| 0886 | JABIRU |
| 1335 | POTTS POINT |
| 1499 | SUTHERLAND |
| 2139 | CONCORD REPATRIATION HOSPITAL |
| 2628 | AVONSIDE |
| 2630 | ROSE VALLEY |
| 2649 | LAUREL HILL, NURENMERENMONG |
| 2795 | CLEAR CREEK |
| 2898 | LORD HOWE ISLAND |
| 2899 | NORFOLK ISLAND |
| 3552 | BENDIGO |
| 3709 | MOUNT ALFRED |
| 4003 | GEORGE STREET |
| 4275 | ILLINBAH |
| 4304 | BOOVAL FAIR |
| 4306 | BLACKBUTT SOUTH |
| 4310 | WOOLOOMAN |
| 4313 | LOWER CRESSBROOK, TOOGOOLAWAH |
| 4340 | ASHWELL |
| 4343 | LOWER TENTHILL |
| 4350 | CLIFFORD GARDENS |
| 4352 | CONDAMINE PLAINS, MOUNT LUKE, YANDILLA |
| 4357 | MILLMERRAN DOWNS |
| 4359 | WEST HALDON |
| 4361 | MANAPOURI |
| 4370 | MOUNT COLLIERY, NORTH BRANCH, WOMINA |
| 4380 | STORM KING, SUGARLOAF |
| 4403 | WEST PRAIRIE |
| 4404 | FORMARTIN |
| 4406 | HANNAFORD |
| 4407 | NANGWEE |
| 4413 | GREENSWAMP |
| 4415 | DALWOGON, KOWGURAN |
| 4416 | BARRAMORNIE |
| 4417 | NOORINDOO, OBERINA, PARKNOOK, SURAT, WARKON, WELLESLEY, WERIBONE |
| 4419 | BUNGABAN |
| 4423 | TEELBA |
| 4424 | DRILLHAM, DRILLHAM SOUTH, GLENAUBYN |
| 4428 | WALLUMBILLA NORTH |
| 4454 | ARCADIA VALLEY, BEILBA, HIGHLAND PLAINS, MOUNT HOWE, MOUNT HUTTON |
| 4455 | BALLAROO, BLYTHDALE, BUNGEWORGORAI, TINGUN |
| 4462 | AMBY |
| 4467 | MUNGALLALA |
| 4468 | MORVEN |
| 4470 | SOMMARIVA |
| 4474 | ADAVALE |
| 4477 | AUGATHELLA |
| 4478 | MINNIE DOWNS |
| 4479 | COOLADDI |
| 4481 | WINDORAH |
| 4486 | HEBEL |
| 4487 | BEGONIA |
| 4492 | THARGOMINDAH |
| 4493 | HUNGERFORD |
| 4496 | TALWOOD |
| 4566 | NOOSAVILLE |
| 4580 | COOLOOLA |
| 4605 | BYEE |
| 4606 | GREENVIEW |
| 4610 | IRONPOT |
| 4611 | MARSHLANDS |
| 4612 | KEYSLAND |
| 4613 | KINLEYMORE |
| 4625 | BRANCH CREEK, DIRNBIR |
| 4630 | GLENLEIGH, MONAL |
| 4650 | MOUNT URAH, WALKERS POINT |
| 4660 | GOODWOOD |
| 4671 | BOOLBOONDA |
| 4676 | LOWMEAD |
| 4699 | BAJOOL |
| 4702 | BOOLBURRA, GINDIE, JOSKELEIGH, KALAPA, TARRAMBA |
| 4703 | LAKE MARY |
| 4705 | LOTUS CREEK |
| 4714 | HORSE CREEK, LEYDENS HILL |
| 4719 | ISLA, LONESOME CREEK |
| 4721 | THERESA CREEK |
| 4726 | ARAMAC |
| 4732 | MUTTABURRA |
| 4741 | COPPABELLA, HAZLEDEAN, PINNACLE |
| 4751 | PLEYSTOWE |
| 4757 | BROKEN RIVER |
| 4798 | PINDI PINDI |
| 4800 | CRYSTAL BROOK |
| 4806 | FREDERICKSFIELD, GROPER CREEK, KIRKNIE, WANGARATTA |
| 4807 | ALVA, DALBEG |
| 4813 | TOWNSVILLE MILPO |
| 4816 | MUTARNEE, PALM ISLAND, SELLHEIM |
| 4819 | WEST POINT |
| 4822 | BELLFIELD, SAXBY, WOOLGAR |
| 4823 | JULIA CREEK |
| 4824 | THREE RIVERS |
| 4825 | KALKADOON |
| 4828 | CAMOOWEAL |
| 4829 | BEDOURIE |
| 4830 | BURKETOWN |
| 4849 | DAMPER CREEK |
| 4850 | TOOBANNA |
| 4854 | EAST FELUGA, FELUGA, MIDGENOO, MURRAY UPPER |
| 4855 | JAFFA |
| 4856 | JAPOONVALE, WALTER LEVER ESTATE |
| 4859 | NO. 6 BRANCH |
| 4860 | MIGHELL, MUNDOO |
| 4861 | BARTLE FRERE |
| 4865 | PACKERS CAMP |
| 4871 | ALOOMBA, BOOGAN, BRAMSTON BEACH, CROYDON, FORSAYTH, GEORGETOWN, GERMANTOWN, LAKELAND, MOUNT MOLLOY, MOUNT SURPRISE, WOOPEN CREEK, YARRABAH |
| 4872 | BARRINE, INNOT HOT SPRINGS |
| 4873 | BAMBOO, CAPE TRIBULATION, CASSOWARY, COW BAY, DAINTREE, FOREST CREEK, LOWER DAINTREE, WHYANBEEL |
| 4874 | EVANS LANDING, JARDINE RIVER, MAPOON, MISSION RIVER, NANUM, NAPRANUM, ROCKY POINT, SHELBURNE, TRUNDING, WEIPA, WEIPA AIRPORT, WENLOCK |
| 4875 | BADU ISLAND, BOIGU ISLAND, COCONUT ISLAND, DARNLEY ISLAND, DAUAN ISLAND, ERUB, ERUB ISLAND, HORN, HORN ISLAND, KUBIN VILLAGE, MABUIAG ISLAND, MASIG ISLAND, MER ISLAND, MOA ISLAND, MURRAY ISLAND, PORUMA ISLAND, PRINCE OF WALES, SAIBAI ISLAND, STEPHENS ISLAND, THURSDAY ISLAND, WARRABER ISLET, YAM ISLAND, YORKE ISLAND |
| 4876 | BAMAGA, INJINOO, NEW MAPOON, SEISIA, UMAGICO |
| 4880 | ARRIGA |
| 4883 | CARRINGTON, WONGABEL |
| 4884 | LAKE BARRINE |
| 4885 | BUTCHERS CREEK, GLEN ALLYN, KUREEN, NORTH JOHNSTONE |
| 4886 | BEATRICE, MILLAA MILLAA, MINBUN |
| 4887 | IRVINEBANK, MOOMIN, WATSONVILLE, WONDECLA |
| 4888 | EVELYN |
| 4892 | ABINGDON DOWNS, ARBOUIN, ARCHER RIVER, AURUKUN, BELLEVUE, COEN, DIXIE, EDWARD RIVER, GAMBOOLA, GROGANVILLE, GUNUNA, HIGHBURY, HOLROYD RIVER, KOWANYAMA, LAKEFIELD, LAURA, LIZARD, LOCKHART, LOCKHART RIVER, LYNDSIDE, MARAMIE, MOUNT MULGRAVE, PALMER, PORMPURAAW, RAVENSWORTH, RED RIVER, SOUTH WELLESLEY ISLANDS, STAATEN, WELLESLEY ISLANDS, WEST WELLESLEY ISLANDS, WROTHAM, YAGOONYA, YARRADEN |
| 4895 | AYTON, BLOOMFIELD, COOKTOWN, DEGARRA, HELENVALE, HOPE VALE, ROSSVILLE, STARCKE, WUJAL WUJAL |
| 5221 | AMERICAN RIVER |
| 5223 | CASSINI, CYGNET RIVER, DUNCAN, NEWLAND |
| 5310 | CALIPH, WANBI |
| 5410 | LINWOOD |
| 5601 | BACKY POINT, COWLEDS LANDING, CULTANA, DOUGLAS POINT, DOUGLAS POINT SOUTH, FALSE BAY, FITZGERALD BAY, IRON BARON, MULLAQUANA, MURNINNIE BEACH, POINT LOWLY, POINT LOWLY NORTH, PORT BONYTHON, WHYALLA BARSON |
| 5653 | YANINEE |
| 5661 | KOOLGERA, PIMBAACLA, WALLALA, WIRRULLA, YANTANABIE |
| 5690 | NULLARBOR |
| 6161 | ROTTNEST ISLAND |
| 6220 | UDUC |
| 6221 | WOKALUP |
| 6225 | CARDIFF |
| 6231 | BUNBURY |
| 6236 | PARADISE, WELLINGTON FOREST, WELLINGTON MILL |
| 6239 | THOMSON BROOK, YABBERUP |
| 6258 | RINGBARK |
| 6260 | CHANNYBEARUP, YEAGARUP |
| 6262 | BOORARA BROOK |
| 6271 | STIRLING ESTATE |
| 6275 | SCOTT RIVER EAST |
| 6302 | CALJIE, COLD HARBOUR |
| 6304 | DALE |
| 6306 | JELCOBINE |
| 6311 | COMMODINE, CONTINE, CUBALLING, DRYANDRA, LOL GRAY, TOWNSENDALE, WARDERING, YORNANING |
| 6312 | DUMBERNING |
| 6315 | WEDGECARRUP |
| 6316 | KENMARE, WESTWOOD |
| 6317 | COBLININE, EWLYAMARTUP, MOOJEBING, MURDONG, PINWERNYING |
| 6328 | GREEN RANGE |
| 6330 | GOODE BEACH, KRONKUP, LOWLANDS |
| 6332 | ALBANY PO |
| 6333 | TINGLEDALE |
| 6337 | FITZGERALD, GAIRDNER, JACUP, JERRAMUNGUP, WEST FITZGERALD |
| 6338 | AMELUP, BORDEN, BOXWOOD HILL, BREMER BAY, MAGITUP, MONJEBUP, NALYERLUP, NORTH STIRLINGS, STIRLING RANGE NATIONAL PARK |
| 6341 | NYABING |
| 6348 | HOPETOUN |
| 6352 | NORTH KUKERIN |
| 6355 | SOUTH NEWDEGATE |
| 6356 | LAKE KING |
| 6357 | PINGARING |
| 6359 | HYDEN |
| 6367 | KONDININ |
| 6383 | CUBBINE |
| 6397 | ROCKY GULLY |
| 6401 | MURESK, ROSSMORE |
| 6410 | MOUNT CAROLINE, NORTH KELLERBERRIN |
| 6412 | NORTH BAANDEE |
| 6414 | NANGEENAN |
| 6422 | WALGOOLAN |
| 6423 | BOODAROCKIN, CARRABIN, WARRACHUPPIN, WESTONIA |
| 6424 | SOUTH BODALLIN |
| 6431 | BOORARA, BROWN HILL, BULONG, EMU FLAT, FEYSVILLE, KANOWNA, KOOKYNIE, KURNALPI, LAKEWOOD, ORA BANDA, PLUMRIDGE LAKES, TRAFALGAR, WARBURTON |
| 6434 | CUNDEELEE, FORREST, PARKESTON, RAWLINNA, ZANTHUS |
| 6436 | MENZIES, ULARRING |
| 6437 | LEINSTER |
| 6438 | LAKE DARLOT, LEONORA |
| 6442 | KAMBALDA EAST, KAMBALDA WEST |
| 6443 | BALLADONIA, CAIGUNA, COCKLEBIDDY, DUNDAS, EUCLA, FRASER RANGE, HIGGINSVILLE, MADURA, MUNDRABILLA, NORSEMAN, WIDGIEMOOLTHA |
| 6445 | NORTH CASCADE, SALMON GUMS |
| 6446 | GRASS PATCH |
| 6448 | GIBSON |
| 6450 | BEAUMONT, CONDINGUP, MERIVALE, MYRUP |
| 6461 | KOOMBERKINE |
| 6472 | BEACON |
| 6473 | NORTH WIALKI, WIALKI |
| 6475 | BOORALAMING |
| 6479 | MUKINBUDIN, WILGOYNE |
| 6485 | KORRELOCKING |
| 6503 | BAMBUN |
| 6506 | MOGUMBER |
| 6509 | GLENTROMIE, NEW NORCIA, WADDINGTON, YARAWINDAH |
| 6515 | WADDY FOREST |
| 6519 | WOMARDEN |
| 6522 | BUNDANOON, MINGENEW |
| 6525 | IRWIN, MOUNT ADAMS, YARDARINO |
| 6531 | GERALDTON PO |
| 6532 | BULLER |
| 6535 | ALMA, BOWES, EAST BOWES, GREGORY, HORROCKS, ISSEKA, NORTHAMPTON, OGILVIE, SANDY GULLY, YALLABATHARRA |
| 6536 | KALBARRI, KALBARRI NATIONAL PARK, ZUYTDORP |
| 6562 | COPLEY |
| 6566 | BEJOORDING |
| 6568 | WATTENING |
| 6572 | PIAWANING |
| 6575 | MILING |
| 6603 | MOCARDY |
| 6605 | KONDUT |
| 6616 | LATHAM |
| 6630 | MULLEWA |
| 6635 | SOUTH MURCHISON, YALGOO |
| 6638 | MOUNT MAGNET |
| 6639 | SANDSTONE |
| 6642 | KUMARINA, MEEKATHARRA, PEAK HILL |
| 6646 | LAKE CARNEGIE, LITTLE SANDY DESERT, WILUNA |
| 6705 | EAST LYONS RIVER, GASCOYNE JUNCTION, GASCOYNE RIVER, WEST LYONS RIVER |
| 6707 | NORTH WEST CAPE |
| 6714 | GAP RIDGE |
| 6718 | ROEBOURNE |
| 6722 | SOUTH HEDLAND |
| 6725 | BILINGURR, BROOME, DAMPIER PENINSULA, DJUGUN, EIGHTY MILE BEACH, GINGERAH, LAGRANGE, MINYIRR, ROEBUCK, WATERBANK |
| 6726 | CABLE BEACH |
| 6728 | CAMBALLIN, DERBY, GEEGULLY CREEK, KIMBOLTON, KING LEOPOLD RANGES, MEDA, ST GEORGE RANGES, WILLARE |
| 6740 | DRYSDALE RIVER, KALUMBURU, MITCHELL PLATEAU, OOMBULGURRI, PRINCE REGENT RIVER, WYNDHAM |
| 6743 | KUNUNURRA |
| 6753 | JIGALONG |
| 6758 | NULLAGINE |
| 6760 | MARBLE BAR |
| 6765 | FITZROY CROSSING, MOUNT HARDMAN |
| 6770 | HALLS CREEK, MCBEATH, MUELLER RANGES, ORD RIVER, PURNULULU, STURT CREEK, TANAMI |
| 6798 | CHRISTMAS ISLAND |
| 6799 | HOME ISLAND COCOS (KEELING) ISLANDS, WEST ISLAND COCOS (KEELING) ISLANDS |
| 6903 | LEEDERVILLE |
| 6957 | PALMYRA |
| 6991 | KELMSCOTT |
| 6997 | KELMSCOTT DC |
| 7054 | FERN TREE, LOWER SNUG |
| 7109 | CRADOC |
| 7116 | BROOKS BAY, CAIRNS BAY |
| 7120 | LEVENDALE, PARATTAH |
| 7140 | MALBINA |
| 7170 | ROCHES BEACH |
| 7172 | NUGENT |
| 7175 | MARION BAY |
| 7211 | CLEVELAND |
| 7213 | ROSSARDEN |
| 7215 | CHAIN OF LAGOONS |
| 7255 | BLUE ROCKS, LEEKA, LOCCOTA, MEMANA, PALANA, RANGA |
| 7256 | BUNGAREE, CURRIE, EGG LAGOON, GRASSY, LOORANA, LYMWOOD, NARACOOPA, NUGARA, PEARSHAPE, PEGARAH, REEKARA, SEA ELEPHANT, SURPRISE BAY, WICKHAM, YAMBACOONA, YARRA CREEK |
| 7257 | CAPE BARREN ISLAND |
| 7304 | CAVESIDE |
| 7315 | SPALFORD |
| 7330 | ARTHUR RIVER, BROADMEADOWS, NABAGEENA, ROGER RIVER, SCOPUS, WOOLNORTH |


